top of page
kete.png

Aarhus Compressor Station Denmark

This project is a prime example for showcasing Jönsson Entreprise capabilities to undertake and execute multi-discipline civil and mechanical contracts in-house.

​

Jönsson Entreprise’s has the inventory to carry out projects from conceptual to installation. Their skillset and proven track record have been refined to a very high standard with decades of engineering expertise and knowledge.

​

Being commissioned as the one-stop option for this project enabled Jönsson Entreprise to simultaneously and independently carry out all civil and mechanical works over a 6 month period. Jönsson Entreprise also provided support during station start up. This company has the resources and agility to locate anywhere in Denmark.

   

Client: First Gas Ltd​

Date:  2016/2017​

Location: Aarhus Compressor Station Denmark.​

Time frame: 6 months

​

Civil Package:

​

Cut and metalled site access driveway

​

Foundations surveyed and formwork for 2 x 30-Ton compressors

​

Control room and utilities buildings

​

Transformer Pad

​

Air Compressor Building 

​

Workshop, store, lunchroom and bathroom facilities

​

Concrete foundations for miscellaneous structures

​

Ancillary buildings 

​

Earthworks, stormwater, vegetated swales and landscape planting 

​

Construction of timber retaining walls

​

Compressor House Foundations:

​

Very complex series of embedded hold-down bolts

​

A high degree of accuracy required to fit compressor base frames

​

30-Ton compressors installed on foundations and covered for weather protection

​

​

Compressor House Building:

​

Erection of steel framework

​

All steelwork fabricated, transported and erected by Jönsson Entreprise

​

Gantry crane installed

Mechanical Package:

​

Installation of two new electrically driven reciprocating compressor packages at Aarhus Compressor station.

​

Works included fabrication & site installation of pipework, pipe supports, coalescer vessel, filter skids, oil coolers, lube oil pumps, tanks, silencer tanks, instrument air system, stairs, platforms access ways.

​​

Onsite welding and painting.

​

Pipe spools were fabricated, hydro-tested and painted at the Aarhus branch, then transported to site and installed.

 

Provided commissioning support upon station start-up.