New research building for DTU Space – B330

​

Jönsson Entreprise A/S is developing and constructing DTU Space's new research facilities for future space research. The new building – B330 – is being developed in close integrated collaboration with Artelia Danmark, CCO Arkitekter and DTU as the client. The starting point is sustainability, interdisciplinary, innovation and with a continuous focus on accommodating future space research in Denmark and Europe.

​

What are we building?


Jönsson Entreprise A/S is building DTU Space's new research building as a turnkey contract. The building is being developed in close collaboration with Artelia Danmark, who, together with CCO Arkitekter, are the turnkey consultants on the project.

 

The building focuses on minimizing the climate impact of the load-bearing structures, minimizing energy consumption in operation with a special focus on process energy, and design for dismantling and adaptation. Therefore, the building has also found its shape after variant analyses and by the entire team working closely together from the start.

​

Integrated collaboration model


The project is prepared and implemented from start to finish in a value-creating, close and binding collaboration between the general consultant, general contractor and client.

​

Read more about the project at DTU here
DTU Space – B330 – new research building.

​

Renderings © CCO Architects
Photo © ESA – Andreas Mogensen

 

Client : Technical University of Denmark
Form of company : Total company
Contract price : DKK 245 million.
Partners : Stensen & Co Architects, 
Location : Lyngby
Area : 6,600 m²
Construction period : Under construction

kai.png

Novo Nordisk Soborg
Modernization of Novo Nordisk's office and kitchen facilities.

​

What are we building?

​

At Jönsson Entreprise A/S, we are in full swing modernizing Novo Nordisk's office headquarters at Østmarken in Søborg. The phase includes approximately 14,000 m² divided into basement, ground floor, 1st and 2nd floors - as well as technical work on the roof.

We are renovating the office floors with a focus on upgrading the building's heating system and modernizing the interior facilities. An important part of the work is preserving and reusing as many of the existing materials as possible – both for sustainability and resource reasons.

​

At the same time, we are remodeling and expanding the kitchen and cafeteria area so that there is room for even more diners.

The renovation is taking place while the building is in operation on the upper floors. This places special demands on planning and coordination – and on consideration in the daily execution.

​

Client : Novo Nordisk A/S
Company type : Main company
Contract price : 80 million DKK.
Location : Soborg
Scope : 14,000 m² (the areas extend over approximately 24,000 m²)
Construction period : Under construction

aka.png

The building is located on the corner of Asylgade and Frederiksgade in Skive.

The apartment building, which is on 3½ floors, has an attached basement.

The building is also built together with the property in Frederiksgade.

​

Facts about the project

​

ProjectNew construction of 12 rental apartments

Period15/9 2009 to 31/3 2011

​

DeveloperHUK A/S

ArchitectHUK A/S

​

EngineerMidtconsult AS

Scope2,000 m²

​

ContractMain contract

Focus/otherEnergy class 1

uka1.png

Facts about the project

 

Project

New construction of 20 homes as townhouses

​

Period

1/9 2015to 1/12 2016

​

Developer

Jönsson  Housing Company

​

Architect

GPP Architects

​

Engineer

Jönsson Consulting Engineers A/S

​

Scope

2,084 m²

​

Enterprise

Total enterprise

​

Focus/ Other

Meets the requirements for BR 2015, 1st prize

in turnkey contract competition

 

 

 

The construction includes 2 x 10 homes as a dense/low-rise development, including the establishment of carports, common areas, etc.

​

The homes fit into the area, creating a beautiful and characterful local environment.

The building blocks are positioned offset from each other to provide a varied expression and to optimize sunlight conditions and minimize visibility for the individual home.

​

The customer says

​

We have worked with the construction company Jönsson Entreprise A/S on new construction of rental housing several times. It is our experience that their project department and craftsmen deliver a professional piece of work and we are happy with the cooperation. In terms of design, they have delivered competitive housing concepts, which we are already experiencing great demand for among our tenants during the implementation. I especially appreciate their responsibility and professional abilities to act solution-oriented during the construction process.

​

Fremming Carsten Hansen
Construction Manager, Viborg Housing

kat 1.png

The project involves the construction of 30 modern public senior housing units in Kirketerp.

The units will be built as a mixture of one- and two-story units.

​

In addition to the units, a community center with shared facilities will be built, including a common room with associated toilets and a kitchen, as well as a guest room with its own toilet and bathroom.

​

In addition, the community center will house a smaller room with a kitchenette and a toilet.

​

The project also includes the construction of all surrounding outdoor areas, including gardens and terraces, roads, paths and
parking areas, environmental/waste stations, and the design of common areas.

​

​

Facts about the project

Project

Construction of 30 public senior housing units

and a community center

​

Period

01.09.2024 - 31.03.2026

​

Developer

Lejerbo Hadsund department 1228-1

​

Architect

Architectural firm Kristian H. Nielsen

​

Engineer

Norconsult

​

Scope

2,630 m2

​

Contract

Turnkey contract

2c.png

                                 Kærbyhus – new construction of 28 homes

​

​

Jönsson Entreprise was the general contractor for Vivabolig on the Kærbyhus project. Kærby Hvilehjem on Ny Kærvej in Aalborg was transformed into new, beautiful family homes with the establishment of a three-story building of 28 public family homes, of which 22 are accessible homes.

​

Projects included conversions to existing buildings, demolition, necessary terrain adjustments, material and labor costs, in-house construction management, foundations, reproduction, regulatory processing, construction site operation, winter measures, winter interim measures of all kinds, and drying.


There were approximately 20 subcontractors involved in the project during the construction period.

Jönsson Entreprise has carried out its own concrete production, concrete element assembly, sewers, soil, paving, landscaping, and exterior and interior masonry work.

​

​

​