Skanderborg Cooperative Housing Association
Roundabout on Virringvej
Redevelopment of the intersection between Virringvej, Sigkærgårdsvej and Tårnfalkebakken in Skanderborg into a roundabout
The project includes intersection reconstruction, rainwater management in the roundabout, and various adjustments in all four access branches, including the adjustment of the existing two-way cycle path so that it will be directed to the roundabout in the future.
​
The contract includes the following main works and quantities:
​
-
Establishment of traffic control measures
-
Clearing of existing plantings and pavements
-
Breaking up of approx. 1,100 m² of asphalt and unbound base layers
-
Removal of approximately 150 m³ of soil
-
Excavation of approximately 450 m³ of raw soil
-
Regulation and compaction of approximately 1,650 m² of roadbed
-
Adaptation of existing noise barriers and construction of new noise barriers
-
Coordination with relevant utility companies in connection with the relocation of wires and cables
-
Laying of approximately 100 lbm of rainwater pipes ø160 mm
-
Laying of approximately 225 lbm of drainage pipes in filter gravel
-
Cancellation of five road drainage wells and installation of eight new gutter wells and two new drainage wells
-
Laying of approx. 800 m³ of bottom protection and approx. 1,525 m² of SG II
-
Laying of approximately 2,900 m² of asphalt
-
Setting of approximately 75 lbm curbstone
-
Establishment of new roadway markings and restoration of road signs and three lighting masts
-
Laying out approx. 400 m² of soil on flower beds, slopes, etc. including grass seeding.